Pay in 4 interest-free payments of $3.74 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 16 - Aug 21
Pay in 4 interest-free payments of $3.74 Learn more
Ships within 48 hours · Estimated delivery Aug 16 - Aug 21
ID: 2023073131
25" highID: 19114Collection: The Map ManAtlas: USGS 13th Annual Report 1893
Type(s): Province Map
ID: 2024090336
From the bottom of the map
BTC Report 01 1895 Sheet 08: Subway Girder Construction Details, Boston, Massachusetts Step 2: Frame Option:No Frame ID: 2023073131Subject: Tremont Street Subway (Now MBTA Green Line) Publisher: Boston Transit Commission Type: Architectural Drawing, Print Size: 14. 25" wide x 9" high ID: BIT166360 Collection: WardMaps LLC Atlas: Boston Transit Commission Annual Report 01 1895